Determination of Time and Cost Deviations on the Example of the Residential Construction Project in Štinjan
Main Article Content
Abstract
The aim of work is to present a model for monitoring the construction time and cost aspects of terraced houses in Štinjan. The model will include the development of a structural breakdown of the project, planned cost curve and time plan of works using the method of past activities. In addition to the curve of planned values, the curve of realized values will also be created. The identified deviations will be analyzed, the risks that caused them will be identified, and appropriate measures, to reduce or eliminate the deviations, shall be proposed.
Article Details
Issue
Section
The content of the journal is available in its entirety without fees. Users can read it, download it and share it with other parties on the condition of correctly citing the original, not modifying or in other way utilizing material for commercial purposes, and using the material in accordance with CC BY-NC-ND license of Creative Commons (CC) licenses.